Maeroa Gully experienced significant erosion following a severe weather event. After earthworks were completed to reshape the area, our team applied a specialised hydroseeding solution to stabilise the bank. Using a combination of Hydro 1000 and Flexterra, along with a Rye/Clover seed mix, we achieved excellent ground coverage. Our team extended hoses down the steep terrain to ensure even application and effective erosion control.